Substation inspection in 3D
← Boltz AI

Substation inspection in 3D

A 115/13.8 kV substation as the planner sees it: live equipment, structures, inspection targets, drone docks and one complete inspection flight.

Drag to rotate · scroll or pinch to zoom · right-drag to pan

The yard spans about 100 × 80 m. Drone docks are shown as green squares. Switch layers on and off to see what the drone has to work around.